If you’re planning to build a new custom home in Illinois, one of your first questions is likely, “How long will it take?” The building timeline can vary a lot depending on the complexity of the home, the location, and other key factors. Here’s what you need to know about the factors that influence construction speed and how you can optimize your build time.
Average Time to Build a New Custom Home
The building timeline of a new home can range from just a few months to over a year. On average, building a single-family home in the US can take about seven months. However, larger or more complex custom homes can take closer to 9-12 months or longer.
Key Factors That Affect Construction Time
-
Weather and Site Conditions
Illinois’ climate is a big factor in construction timelines. Harsh winters, heavy rain, or extreme summer heat can delay important stages like laying the foundation or framing.
- Topography: Land preparation can take longer if your plot contains unexpected challenges like rocks or underground water.
- Weather Sensitivity: Certain tasks, such as pouring concrete or framing, require dry conditions. Once the roof is on, weather becomes less of a concern.
-
Contractor vs. Owner-Built Homes
The decision to hire a contractor or build the home yourself has a major impact on timelines. Contractor-built custom homes can typically take about nine months. On the other hand, owner-built homes can take more than a year to build, as the owner has to manage every detail, including subcontractors and inspections. Working with an experienced contractor can streamline the process and avoid delays due to inexperience.
-
Complexity of Design
The more customized your home is, the longer it will take. Unique architectural details, specialty materials, and complex layouts usually require additional time for planning and construction. Conversely, simpler designs with standard materials can speed up the process.
-
Availability of Materials and Labor
Delays in getting materials or finding skilled workers can also slow down a project. Illinois’ construction industry, like others nationwide, has faced challenges with labor shortages and supply chain disruptions, especially in recent years.
Tips to Shorten Your Building Time
- Start with a Thorough Plan: Work with a contractor who emphasizes upfront planning to manage issues early.
- Choose Experienced Professionals: Contractors with a strong local network can secure permits, materials, and workers more efficiently.
- Build During the Right Seasons: If possible, aim to complete weather-sensitive tasks during Illinois’ milder months.
- Be Decisive: Delayed decisions on design factors, materials, or finishes can push back the timeline.
Schedule a New Custom Home Discovery Call with Our Team at SG Home Builders!
At SG Home Builders, we specialize in delivering high-quality custom homes on time and within budget. Our team will guide you through the entire process, from site preparation to finishing touches, and ensure a seamless experience.
Ready to get started? Schedule a discovery call with us today and start your journey toward building your dream home in Illinois!
FAQ’s
1. How long does it typically take to build a custom home?
Most custom homes take between 12-24 months from groundbreaking to completion. The timeline can vary based on home size, complexity, permitting, weather, and builder efficiency.
2. What factors can delay a custom home build?
Delays can be caused by weather, design changes, permitting issues, material shortages, or inspection schedules. Choosing an experienced builder and finalizing selections early can help minimize delays.
3. Does the design phase count in the construction timeline?
No. The design and planning phase—including architectural drawings, engineering, and approvals—typically takes an additional 3-12 months before construction even begins. This time range greatly depends on whether a lot has been purchased and changes that occur to the design.
4. Can a custom home be built in less than 6 months?
It’s rare. While smaller or semi-custom homes may be completed in under 6 months, fully custom homes require more time due to personalized plans, custom materials, and more inspections.
5. How can I speed up the custom home building timeline?
To streamline the process, finalize your design and selections early, maintain quick communication with your builder, and avoid change orders once construction starts.